Service
Global Projects

Global Projects

長年の経験とノウハウを通じて完璧なサービスで顧客満足を創出します。

A.I.F.は長年のプロジェクト貨物運送経験およびノウハウに基づき、お客様から要請された貨物の特徴を分析し、最適なソリューションを提供しています。

A.I.F.プロジェクトチームは事前に徹底した運送計画の樹立及び分析、専担組織体系の構築を通じて基本設計段階から全工程終了時点まですべての手続きを一括統制及び管理しています。

Europe

  • 1Propeller Project

    Propeller Project

    • PERIOD : 28.Jul.2022
    • ITEM : Propeller
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 2Bio Friends Project

    Bio Friends Project

    • PERIOD : 11.May.2022
    • ITEM : Breakbulk
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 3Renault MCA Project

    Renault MCA Project

    • PERIOD : 03.Jul.2020
    • ITEM : Renault MCA 2400
    • POL : Dangjin, Korea
    • POD : Renault MCA, France

    Key Performance

    Onshore Onshore Antwerp D/port handling Interim storage at d/port H/Ls barge transport from d/port to Ghlin, Belgium Unloading at barge d/port by hiring 2 units of 500MT crane H/Ls inland transport from barge d/port to Renault site

  • 4Hanwha Total Solution Project

    Hanwha Total Solution Project

    • PERIOD : 14.Feb.2020
    • ITEM : Hanwha Total Solution Revamping
    • POL : Marghera, Italy
    • POD : Pyeongtaek, Korea

    Key Performance

    H/Ls chartering

  • 5Energinet. DK Transformer Transport

    Energinet. DK Transformer Transport

    • PERIOD : Oct.2012
    • ITEM : Reactor
    • POL : Busan, Korea via Rotterdam, Netherlands
    • POD : Denmark Aabenraa, Kossoe

    Key Performance

    Transportation of Reactor for ENERGINET. DK (7.80m(L) x 4.20m(W) x 5.20m(H) / 1 unit / 150.00 M/Ton)

  • 6Doosan Heavy Industry Water and Electricity Infrastructure Project

    Doosan Heavy Industry Water and Electricity Infrastructure Project

    • PERIOD : 2008~2009
    • ITEM : Gas Turbines and Generators
    • POL : Germany
    • POD : the U.A.E Jebel Ali Job

    Key Performance

    Transportation of Gas Turbines and Generators from Siemens Germany and Other Sub Suppliers to the U.A.E Jebel Ali Job Site

  • 7SK Energy Heat Exchanger Machine Export

    SK Energy Heat Exchanger Machine Export

    • PERIOD : 18.Sep.2009
    • ITEM : Transportation of Heat Exchanger Machine
    • POL : Arrle, France
    • POD : Busan, Korea

    Key Performance

    Transportation of Heat Exchanger Machine for the SK energy

  • 8Dongbu Steel HR Project

    Dongbu Steel HR Project

    • PERIOD : Aug.2008~Apr.2009
    • ITEM : Major Facilities for the Electricity Plant
    • POL : Danieli, Tenova, Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of Major Facilities for the Electricity Plant

  • 9Amman East Power Project

    Amman East Power Project

    • PERIOD : Jul.2007~Apr.2009
    • ITEM : Major Power Plant Materials
    • POL : Italy
    • POD : Aqaba, Jordan

    Key Performance

    Transportation of Major Power Plant Materials From Suppliers in Italy

  • 10SK New FCC Project

    SK New FCC Project

    • PERIOD : 2007~2008
    • ITEM : FCC (Fluid Catalytic Cracking) Equipment
    • POL : Oberhausen, Germany & Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of FCC (Fluid Catalytic Cracking) Equipment Used in the Gasfication Desulphurization Process That Inproves Refined Oil Production