Service
Global Projects

Global Projects

다년간의 경험과 노하우를 통해 완벽한 서비스로 고객만족을 창출합니다.

A.I.F.는 다년간의 프로젝트 화물 운송 경험 및 노하우를 바탕으로
고객이 요청한 화물의 특징을 분석하여 최적의 솔루션을 제공하고 있습니다.

A.I.F.프로젝트팀은 사전에 철저한 운송 계획 수립 및 분석, 전담조직체계 구축을 통하여
기본설계단계부터 전 공정 종료시점까지 모든 절차를 일괄 통제 및 관리하고 있습니다.

Europe

  • 1Propeller Project

    Propeller Project

    • PERIOD : 28.Jul.2022
    • ITEM : Propeller
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 2Bio Friends Project

    Bio Friends Project

    • PERIOD : 11.May.2022
    • ITEM : Breakbulk
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 3Renault MCA Project

    Renault MCA Project

    • PERIOD : 03.Jul.2020
    • ITEM : Renault MCA 2400
    • POL : Dangjin, Korea
    • POD : Renault MCA, France

    Key Performance

    Onshore Onshore Antwerp D/port handling Interim storage at d/port H/Ls barge transport from d/port to Ghlin, Belgium Unloading at barge d/port by hiring 2 units of 500MT crane H/Ls inland transport from barge d/port to Renault site

  • 4Hanwha Total Solution Project

    Hanwha Total Solution Project

    • PERIOD : 14.Feb.2020
    • ITEM : Hanwha Total Solution Revamping
    • POL : Marghera, Italy
    • POD : Pyeongtaek, Korea

    Key Performance

    H/Ls chartering

  • 5Energinet. DK Transformer Transport

    Energinet. DK Transformer Transport

    • PERIOD : Oct.2012
    • ITEM : Reactor
    • POL : Busan, Korea via Rotterdam, Netherlands
    • POD : Denmark Aabenraa, Kossoe

    Key Performance

    Transportation of Reactor for ENERGINET. DK (7.80m(L) x 4.20m(W) x 5.20m(H) / 1 unit / 150.00 M/Ton)

  • 6Doosan Heavy Industry Water and Electricity Infrastructure Project

    Doosan Heavy Industry Water and Electricity Infrastructure Project

    • PERIOD : 2008~2009
    • ITEM : Gas Turbines and Generators
    • POL : Germany
    • POD : the U.A.E Jebel Ali Job

    Key Performance

    Transportation of Gas Turbines and Generators from Siemens Germany and Other Sub Suppliers to the U.A.E Jebel Ali Job Site

  • 7SK Energy Heat Exchanger Machine Export

    SK Energy Heat Exchanger Machine Export

    • PERIOD : 18.Sep.2009
    • ITEM : Transportation of Heat Exchanger Machine
    • POL : Arrle, France
    • POD : Busan, Korea

    Key Performance

    Transportation of Heat Exchanger Machine for the SK energy

  • 8Dongbu Steel HR Project

    Dongbu Steel HR Project

    • PERIOD : Aug.2008~Apr.2009
    • ITEM : Major Facilities for the Electricity Plant
    • POL : Danieli, Tenova, Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of Major Facilities for the Electricity Plant

  • 9Amman East Power Project

    Amman East Power Project

    • PERIOD : Jul.2007~Apr.2009
    • ITEM : Major Power Plant Materials
    • POL : Italy
    • POD : Aqaba, Jordan

    Key Performance

    Transportation of Major Power Plant Materials From Suppliers in Italy

  • 10SK New FCC Project

    SK New FCC Project

    • PERIOD : 2007~2008
    • ITEM : FCC (Fluid Catalytic Cracking) Equipment
    • POL : Oberhausen, Germany & Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of FCC (Fluid Catalytic Cracking) Equipment Used in the Gasfication Desulphurization Process That Inproves Refined Oil Production