Service
Global Projects

Global Projects

Through years of experience and know-how,
we create customer satisfaction with perfect service.

A.I.F. provides the optimal solution by analyzing the characteristics of the cargo requested by the customer based
on years of project cargo transportation experience and know-how.

The A.I.F. project teams collectively control and manage all procedures from
the primary design stage to the end of the entire process through thorough preemptive transportation planning, analysis, and establishment of dedicated organizational systems.

Europe

  • 1Propeller Project

    Propeller Project

    • PERIOD : 28.Jul.2022
    • ITEM : Propeller
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 2Bio Friends Project

    Bio Friends Project

    • PERIOD : 11.May.2022
    • ITEM : Breakbulk
    • POL : Hamburg, Germany
    • POD : Busan, Korea

    Key Performance

    Port Handling / Breakbulk loading onto container vessel

  • 3Renault MCA Project

    Renault MCA Project

    • PERIOD : 03.Jul.2020
    • ITEM : Renault MCA 2400
    • POL : Dangjin, Korea
    • POD : Renault MCA, France

    Key Performance

    Onshore Onshore Antwerp D/port handling Interim storage at d/port H/Ls barge transport from d/port to Ghlin, Belgium Unloading at barge d/port by hiring 2 units of 500MT crane H/Ls inland transport from barge d/port to Renault site

  • 4Hanwha Total Solution Project

    Hanwha Total Solution Project

    • PERIOD : 14.Feb.2020
    • ITEM : Hanwha Total Solution Revamping
    • POL : Marghera, Italy
    • POD : Pyeongtaek, Korea

    Key Performance

    H/Ls chartering

  • 5Energinet. DK Transformer Transport

    Energinet. DK Transformer Transport

    • PERIOD : Oct.2012
    • ITEM : Reactor
    • POL : Busan, Korea via Rotterdam, Netherlands
    • POD : Denmark Aabenraa, Kossoe

    Key Performance

    Transportation of Reactor for ENERGINET. DK (7.80m(L) x 4.20m(W) x 5.20m(H) / 1 unit / 150.00 M/Ton)

  • 6Doosan Heavy Industry Water and Electricity Infrastructure Project

    Doosan Heavy Industry Water and Electricity Infrastructure Project

    • PERIOD : 2008~2009
    • ITEM : Gas Turbines and Generators
    • POL : Germany
    • POD : the U.A.E Jebel Ali Job

    Key Performance

    Transportation of Gas Turbines and Generators from Siemens Germany and Other Sub Suppliers to the U.A.E Jebel Ali Job Site

  • 7SK Energy Heat Exchanger Machine Export

    SK Energy Heat Exchanger Machine Export

    • PERIOD : 18.Sep.2009
    • ITEM : Transportation of Heat Exchanger Machine
    • POL : Arrle, France
    • POD : Busan, Korea

    Key Performance

    Transportation of Heat Exchanger Machine for the SK energy

  • 8Dongbu Steel HR Project

    Dongbu Steel HR Project

    • PERIOD : Aug.2008~Apr.2009
    • ITEM : Major Facilities for the Electricity Plant
    • POL : Danieli, Tenova, Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of Major Facilities for the Electricity Plant

  • 9Amman East Power Project

    Amman East Power Project

    • PERIOD : Jul.2007~Apr.2009
    • ITEM : Major Power Plant Materials
    • POL : Italy
    • POD : Aqaba, Jordan

    Key Performance

    Transportation of Major Power Plant Materials From Suppliers in Italy

  • 10SK New FCC Project

    SK New FCC Project

    • PERIOD : 2007~2008
    • ITEM : FCC (Fluid Catalytic Cracking) Equipment
    • POL : Oberhausen, Germany & Marghera, Italy
    • POD : Busan, Korea

    Key Performance

    Transportation of FCC (Fluid Catalytic Cracking) Equipment Used in the Gasfication Desulphurization Process That Inproves Refined Oil Production