Through years of experience and know-how,
we create customer satisfaction with perfect service.
A.I.F. provides the optimal solution by analyzing the characteristics of the cargo requested by the customer based
on years of project cargo transportation experience and know-how.
The A.I.F. project teams collectively control and manage all procedures from
the primary design stage to the end of the entire process through thorough preemptive transportation planning, analysis, and establishment of dedicated organizational systems.
Japan
-
1Plant Project
Plant Project
- PERIOD : 29.Oct.2020
- ITEM : Moter 4090KW 28P 6600V
- POL : Busan, Korea
- POD : Nagoya, Japan
Key Performance
Port Handling / Breakbulk loading vessel
-
2S - Project
S - Project
- PERIOD : 17.May.2019
- ITEM : Hot High Pressure Separator
- POL : Ariake, Japan
- POD : Ulsan, Korea
Key Performance
Port Handling / Breakbulk loading vessel
-
3SKI V-Project
SKI V-Project
- PERIOD : Apr~Jul.2013
- ITEM : Equipment
- POL : Japan
- POD : Busan, Korea
Key Performance
Customized Bulk Charter Contract, Loading Plan and Securing Job for Over Weight Shipment.
-
4BPEX Project
BPEX Project
- PERIOD : Sep.2008~Mar.2009
- ITEM : Crane
- POL : Kobe, Japan
- POD : Map Ta Phut, Thailand
Key Performance
Customized Bulk Charter Contract Planning of Floating Crane for T/S Operations Loading Plan and Securing Welding Job of Shipment Over 150 Ton for Shipment Safety
-
5Optical Film Plant Project 2nd
Optical Film Plant Project 2nd
- PERIOD : Apr~Nov.2008
- ITEM : Optical Film Bulk
- POL : Japan
- POD : Ulsan, Korea
Key Performance
Scheduling and Load Survey for Bulk, Loading Plan and Securing Job for Over Weight Shipment.
-
6Optical Film Plant Project
Optical Film Plant Project
- PERIOD : Apr~Nov.2008
- ITEM : Optical Film Bulk and Special Container
- POL : Japan
- POD : Ulsan, Korea
Key Performance
Scheduling and Load Survey for Bulk and Special Container Operation. Loading Plan and Securing Job for Over Weight Shipment
-
7SKC Airgas Ulsan Plant Project
SKC Airgas Ulsan Plant Project
- PERIOD : May.2008
- ITEM : SKC Airgas Ulsan Plant
- POL : Yokohama, Japan
- POD : Busan, Korea
Key Performance
Transportation for Super-Heavy Shipment(200ton/Unit) to alongside the Berth Barge Service to M/V. Connected Service Plan between Ground Crane and Floating Crane for Loading on the Vessel
-
8Taebaek Super 300 Project
Taebaek Super 300 Project
- PERIOD : Sep~Oct.2007
- ITEM : Racing Car and Related Parts
- POL : Tokyo, Kobe, Japan
- POD : Busan, Korea
Key Performance
Simultaneous Shipment Scheduling (Tokyo/Kobe) to Meet the Racing Game Event. Customized Loading Plan for Racing Car and Related Parts